Facts and Figures

  • Location: 4601 Pecan Brook Dr.
    Austin, TX 78724
  • Estimated Cost of Proposed Projects: $570,000
  • Year Built: 2003
  • Building Area: 60,294 Sq. Ft.
  • Site: 44 Acres

Stay Informed

Overview

Named for Dr. Exalton and Wilhelmina Delco, the Delco Activity Center is located in northeast Austin, near LBJ Early College High School. It opened in fall 2002 and provides facilities for competition in basketball, wrestling, volleyball, cheer-leading and dance as well as student musical performances.

Scope of Work 2017 Bond

  • Districtwide Fire and Intrusion Alarm Upgrades
  • Districtwide Security Camera Replacements 
  • Site Drainage Improvements
  • Technology: Network System Improvements  


Published: Data is from the November 9, 2021, CBOC report. More information can be found here on the CBOC page.


Project Status

  • Construction PhaseConstruction Phase

    Critical Repairs - Crawl Space

    ORIGINAL SCOPE (was completed in previous project): Re-grade around building perimeter so water drains away from building. Raise area-way curb heights to prevent surface water infiltration into crawl space. REVISED SCOPE: Address water infiltration coming in at corner entry hollow metal storefront systems; install canopies at two entries; repair uneven grade between building slab and adjacent flatwork; replace unsafe concrete panel screening face with chain link fence.

    Status: On Schedule Percent Complete: 20
    Expected Completion: 3/20/22
    Notes: This work is on a flexible schedule with other activities at Delco. Austin Public Health rented Delco from September 2020 to September 2021. Project team has been in close communiation and coordination with Delco. Construction began September 2021. Six months duration is anticipated.

  • Complete PhaseComplete Phase

    Renovations at Delco Activity Center

    Repair selected parking lot pavement areas and perimeter sidewalks; upgrade fire and intrusion alarm systems; HVAC renovations.

    Percent Complete: 100

  • Complete PhaseComplete Phase

    Renovations at Delco Activity Center

    Address drainage deficiencies and modifications to storm drain system, including modifications to flatwork at building entries

    Percent Complete: 100

Contracts are subject to be rebid; timeline depends on board approval.

Multi Campus Project Status

Facility Financials

2017 Bond Districtwide Financials

Previous Bond Program Projects

  • 2017

    2017 Bond Book
  • 2013

    2013 Bond Book
  • 2008

    2008 Bond Book
  • 2004

    2004 Bond Book
 