2004 Bond Program Scope of Work
Pave parking lot near kitchen
Install additional exterior security lighting
Resurface playslab
Reconstruct steps and retaining wall at library
Repair/replace approximately 10,000 square feet of built-up roofing
Renovate restroom 105D
Repair damaged plaster walls in various locations
Refurbish cabinet doors in classrooms
Replace ceiling in main corridor and replace damaged ceiling in administration corridor area
Refurbish ceiling in gym
Replace clock system
Replace floor covering in library
Replace ventilation system equipment serving administration area
Add sink with plaster trap in art room
Replace grease trap serving kitchen
Replace water and sanitary sewer lines in under-floor crawl space
Install playslab cover
Install safety and security enhancements
2008 Bond Program Scope of Work
Technology upgrades
Cafeteria and kitchen improvements
Replace dishwasher
Phases
| Current |
Schedule |
Budget |
General |
Environmental |
| Partial roof replacement and repair, refurbishing classroom cabinet doors, installing new and repairing existing corridor ceilings, repairing classroom plaster walls, Repairing deteriorated exterior library steps, paving current gravel back parking lot, installing additional exterior security lighting, replacing the schools grease trap, replacing deteriorated water and sanitary sewer lines in the schools crawl space, replacing an administration area air conditioning clock system. |
Complete. |
Within budget.* |
Paired with Brentwood Elementary School project.
|
Existing on-site detention will be utilized to allow engineered release of storm water into larger area drainage system. ventilation replacement units will be high efficiency equipment and will be commissioned to ensure proper operation and efficiency. Also, water saving plumbing fixtures will lower water usage. |
|
*Budget for the 2004 and 2008 Bond Programs are reported as both individual project budgets and overall
program budget. While specific projects may be over or under budget, the 2004 and 2008 Bond Programs remain well
within the total program budget.
Photos
Click on photo for larger version.
| There are no images for this project. |
|
|
Find Out What's Happening at your School
Recent News
No news available.
Upcoming Events
There are no events scheduled.
Other Events
|
For Contractors |
|
|