2004 Bond Program Scope of Work
• Install additional exterior security lighting
• Construct additional parking spaces in selected locations
• Construct concrete dumpster pad
• Repair/replace approximately 65,000 square feet of built-up roofing
• Remove ventilator fans and seal louver openings at gym
• Construct story-telling structure in library
• Replace ventilation system equipment in selected classrooms
• Replace sanitary sewer lines serving kitchen
• Replace circulation desk in library
• Install playslab cover
• Install safety and security enhancements
2008 Bond Program Scope of Work
• Technology upgrades
• Replace heating, ventilation and air conditioning system equipment in kitchen
Phases
| Current |
Schedule |
Budget |
General |
Environmental |
| Replace sanitary sewer lines under kitchen; add parking on north side; construct concrete dumpster pad; remove ventilator fans and seal louver openings at gym; construct kiva in library; replace deteriorated heating, ventilation and air conditioning heat pump units in classrooms; replace deteriorated circulation desk in library. |
Construction phase. |
Within budget.* |
Library scope increased. 2008 Bond Program heating, ventilation and air conditioning work added. |
Heating, ventilation and air conditioning equipment will be high efficiency and meet or exceed latest energy standards (ASHRAE 90.1, 2001). |
| Install playslab cover. |
Complete. |
Within budget.* |
Grouped with four other schools. |
|
| Reroof entire facility including removal and replacement of existing insulation and deck. Annex canopy reroofing and replacement of base flashing at perimeter and skylights of former gymnasium area. |
Complete. |
Under budget.* |
Paired with Pleasant Hill Annex project. |
New replacement roof system will provide increased thermal efficiency and solar reflectivity. There will be some minor asbestos abatement required on the roofs prior to replacement. |
| Kitchen hood fire suppressant replacement. |
Complete. |
Under budget.* |
|
|
| Safety and security enhancements: closed circuit TV. |
Complete. |
Within budget.* |
Grouped with four other facilities. |
|
| Safety and security: card reader door access. |
Bid phase. |
|
Grouped with three other facilities. |
|
|
*Budget for the 2004 and 2008 Bond Programs are reported as both individual project budgets and overall
program budget. While specific projects may be over or under budget, the 2004 and 2008 Bond Programs remain well
within the total program budget.
Photos
Click on photo for larger version.
| There are no images for this project. |
|
|