Apple At Work Home En Español Interactive Map Annual Report Complete Bond
Election Information 2004 Bond Program 2008 Bond Program
Community Bond
Oversight Committee
Community Involvement Environmental Safety Technology Facility Use and
Boundary Task Force
Performing Arts
Center Task Force
New Schools and Facilities The Apple at Work Logo Media Contact Us FAQs For Contractors For Architects &
Engineers
 
Projects for Ortega

2004 Bond Program Scope of Work

• Install additional exterior security lighting
• Improve drainage at courtyard
• Repair/replace irrigation system
• Replace selected library casework/cabinetry/furnishings
• Repair/replace deteriorated cabinets and sinks in classrooms
• Repair/replace exterior doors, frames and hardware
• Refurbish deteriorated interior doors
• Replace floor covering in selected areas
• Repair/refurbish student and faculty restrooms
• Replace deteriorated exhaust fans in student restrooms
• Renovate abandoned ventilation system equipment in 200-classroom wing
• Install emergency egress and exit lighting
• Replace grease trap serving kitchen
• Install playslab cover
• Install safety and security enhancements

2008 Bond Program Scope of Work

• Technology upgrades
• Replace heating, ventilation and air conditioning system equipment in administration area and install new digital controls

Phases

Current Schedule Budget General Environmental
Install additional exterior security lighting; construct concrete flume to improve drainage from courtyards; repair/replace exterior doors, frames and hardware; repair/replace window systems in administration and cafeteria areas; repair/replace deteriorated cabinets and sinks in classrooms; repair/refurbish student and faculty restrooms; replace deteriorated grease trap; repair/replace deteriorated irrigation system; replace deteriorated library furniture, fixtures and equipment including casework; refurbish deteriorated interior doors; replace floor covering where excessively worn; replace deteriorated/non-functioning exhaust fans in individual student restrooms; remove abandoned heating, ventilation and air conditioning system equipment in 200 classroom wing; install emergency egress and exit lighting. Complete. Under budget.* Summer 2009, contractor will repair/replace some classroom casework that experienced latent defects. Sustainability consultants will review the renovations design to determine if any input for green design and/or rebates can be accomplished with this work.
Install playslab cover. Complete. Within budget.* Grouped with five other schools.
Safety and security: closed circuit TV. Complete. Under budget.* Grouped with four other schools.
Safety and security: card reader door access and door repair. Complete. Within budget.* Grouped with three other schools.

*Budget for the 2004 and 2008 Bond Programs are reported as both individual project budgets and overall program budget. While specific projects may be over or under budget, the 2004 and 2008 Bond Programs remain well within the total program budget.

Photos

Click on photo for larger version.

There are no images for this project.
Find Out What's Happening at your School
Recent News
No news available.
SMTW TFS
1 2 3 4 5 6 7
8 9 10 11 12 13 14
15 16 17 18 19 20 21
22 23 24 25 26 27 28
29 30
Upcoming Events
There are no events scheduled. Other Events
  For Contractors