2004 Bond Program Scope of Work

• Repair/replace irrigation system
• Replace canopy light fixtures
• Improve storm/site drainage at building exterior
• Repair/replace various deteriorated windows
• Extend wall partitions to ceiling to enclose library
• Replace deteriorated doors, frames and hardware at entry vestibule
• Replace worn floor covering in library, administration area, music room and counselors’ offices
• Renovate/refurbish boys’ and girls’ restrooms in gym
• Replace deteriorated ventilation system controls and equipment
• Modify/replace ventilation system equipment serving former open classrooms
• Replace selected library casework/cabinetry/furnishings
• Install playslab cover
• Install safety and security enhancements

2008 Bond Program Scope of Work

• Technology upgrades
• Construct eight-classroom addition

Phases

Current Schedule Budget General Environmental
Replace canopy lighting fixtures; regrade are in front of school and install splash blocks to divert storm water away from building; repair/replace various deteriorated windows; replace deteriorated doors, frames and hardware and entry vestibule; renovate/refurbish girls’ and boys’ restrooms in gym; install direct digital controls with link to the building energy management system; install zone dampers and direct digital controls for heating, ventilation and air conditioning systems in former open-plan classrooms; repair/replace irrigation system in front of school; extend wall partitions to ceiling to enclose library and reduce noise transmission; replace worn floor coverings in library, administration area, music room and counselors’ offices; replace deteriorated furniture, fixtures and equipment including circulation desk. Substantially complete. Under budget.* Paired with work at Mendez Middle School. Green Building principals employed in the selection of building systems equipment and materials.
Provide mechanical ventilation under crawlspace. Complete. Funded using 2002 bond funds. Under budget.*
Playslab cover. Complete. Under budget.* Grouped with five other schools.
Safety and security. Closed circuit TV. Complete. Within budget.* Grouped with four other schools.
Safety and security. Card reader door access. Bid phase. Within budget.* Re-bid to obtain bids within budget.
Renovations. Complete. Within budget.* Paired with project at Mendez Elementary School.
Construct eight-classroom addition. Bid phase. Within budget.*

*Budget for the 2004 and 2008 Bond Programs are reported as both individual project budgets and overall program budget. While specific projects may be over or under budget, the 2004 and 2008 Bond Programs remain well within the total program budget.

Photos

Click on photo for larger version.

There are no images for this project.
Find Out What's Happening at your School
Recent News
No news available.
SMTW TFS
1 2 3 4 5 6 7
8 9 10 11 12 13 14
15 16 17 18 19 20 21
22 23 24 25 26 27 28
29 30
Upcoming Events
There are no events scheduled. Other Events
  For Contractors