2004 Bond Program Scope of Work

• Construct eight-classroom addition
• Improve storm/site drainage at building perimeter
• Repair/replace exterior doors, frames and hardware
• Repair/refinish steel columns and beams of canopy from main building to gym
• Construct entrance canopies at exterior doors
• Replace window glazing in selected areas
• Repair/refurbish classroom walls on west side of building
• Repair/refurbish interior wall surfaces at main entry, in teachers’ workroom and at various classroom doors
• Replace clock system
• Replace door, frame and hardware at classroom restrooms
• Replace worn floor covering in library and at main entry
• Renovate/refurbish student group and faculty restrooms
• Replace ventilation system controls and equipment
• Replace ventilation system heating boiler
• Repair/replace/modify selected ventilation system equipment
• Replace ventilation system circulating pumps
• Relocate/replace grease trap serving kitchen
• Extend wall partitions to ceiling to enclose library
• Replace selected library casework/cabinetry/furnishings
• Install playslab cover
• Install safety and security enhancements

2008 Bond Program Scope of Work

• Technology upgrades

Phases

Current Schedule Budget General Environmental
Grease trap. Complete. Under budget.*
Eight-classroom addition, additional parking, all renovation work and safety and security enhancements. Complete. Within budget.* An energy/sustainability consultant was retained. Considerations include energy efficient equipment, resource efficiency, commissioning, water quality/water savings measures and treatment of glazing with tints and overhangs.
Playslab cover. Complete. Under budget.*

*Budget for the 2004 and 2008 Bond Programs are reported as both individual project budgets and overall program budget. While specific projects may be over or under budget, the 2004 and 2008 Bond Programs remain well within the total program budget.

Photos

Click on photo for larger version.

There are no images for this project.
Find Out What's Happening at your School
Recent News
No news available.
SMTW TFS
1 2 3 4 5 6 7
8 9 10 11 12 13 14
15 16 17 18 19 20 21
22 23 24 25 26 27 28
29 30
Upcoming Events
There are no events scheduled. Other Events
  For Contractors