2004 Bond Program Scope of Work
• Replace canopy light fixtures
• Connect downspouts to storm sewer system
• Refurbish soffits at exterior corridors
• Repair and reseal parking lots and drives
• Provide emergency egress lighting
• Improve storm/site drainage in selected areas
• Provide non-slip surface for exterior corridors
• Replace deteriorated exterior doors and hardware
• Repair/replace brick masonry in various locations and add masonry control joints
• Repair/replace approximately 39,000 square feet of built-up roofing
• Install new suspended ceiling in cafeteria and corridor
• Replace clock system
• Refinish/replace deteriorated interior doors and hardware
• Replace gym flooring
• Seal interior corridor floors and install vinyl tile
• Replace deteriorated exhaust fans
• Install new ventilation system for cafeteria and corridor
• Replace ventilation motor controls and main switchgear
• Refurbish/replace toilets and sink hardware
• Replace main sanitary sewer line
• Install playslab cover
• Install safety and security enhancements
2008 Bond Program Scope of Work
• Technology upgrades
• Cafeteria and kitchen improvements
• Replace dishwasher
Phases
| Current |
Schedule |
Budget |
General |
Environmental |
| Repair/replace approximately 39,000 square feet of built-up roofing. |
Complete. |
Under budget.* |
Two additional roof drains and gas line upgrades per Austin building code were required. |
New replacement roof system will provide thermal efficiency and solar reflectivity. |
| Improve storm/site drainage in selected areas. |
Complete. |
Within budget.* |
After field investigations, it was determined that proper drainage improvements should offset any ventilation requirements to control moisture in crawlspaces. |
Environmental considerations are limited to on-site drainage projects. Care will be taken to avoid excess soil erosion during construction. |
| Install heating, ventilation and air conditioning system for cafeteria, corridor and workroom. |
Complete. |
Within budget.* |
|
All new mechanical systems will meet and exceed the latest energy standards. After project completion, all systems will be commissioned to operate at peak efficiency. |
| Kitchen hood fire suppression replacement. |
Complete. |
Under budget.* |
|
|
| Connect downspouts to underground storm drain, refurbish soffits at exterior corridors, emergency egress lighting, improve site drainage, replace deteriorated exterior doors and hardware, replace sanitary sewer line, replace canopy light fixtures, repair and re-seal parking lots and drives, install playslab cover, provide non-slip surface for exterior corridors, repaint masonry, replace clock system, refinish/replace interior doors and hardware, replace gym flooring, install vinyl tile, replace ventilation motor controls and switch gears, refurbish replace toilet and sink hardware, provide new cafeteria ceiling. |
Complete |
Under budget.* |
|
All designs will meet Austin Energy standards. |
| Playslab cover. |
Complete. |
Under budget.* |
|
|
| Improve cafeteria/kitchen; replace dishwasher; install forced air system in kitchen restroom. |
Construction phase. |
|
Grouped with two other schools. |
|
| Replace dishwasher. |
Bid phase. |
Within budget.* |
Grouped with 13 other schools. |
|
|
*Budget for the 2004 and 2008 Bond Programs are reported as both individual project budgets and overall
program budget. While specific projects may be over or under budget, the 2004 and 2008 Bond Programs remain well
within the total program budget.
Photos
Click on photo for larger version.
| There are no images for this project. |
|
|
Find Out What's Happening at your School
Recent News
No news available.
Upcoming Events
There are no events scheduled.