Apple At Work Home En Español Interactive Map Annual Report Complete Bond
Election Information 2004 Bond Program 2008 Bond Program
Community Bond
Oversight Committee
Community Involvement Environmental Safety Technology Facility Use and
Boundary Task Force
Performing Arts
Center Task Force
New Schools and Facilities The Apple at Work Logo Media Contact Us FAQs For Contractors For Architects &
Engineers
 
Projects for Doss

2004 Bond Program Scope of Work

• Construct additional parking spaces in selected areas and reseal/restripe existing parking lot
• Repave service drive with concrete and construct concrete dumpster pad
• Install additional exterior security lighting
• Construct drainage improvements around perimeter of building
• Repair/replace deteriorated exterior doors, frames and hardware
• Repair/replace approximately 35,000 square feet of built-up roofing
• Replace window wall system at courtyard
• Replace worn folding wall between cafeteria and gym
• Replace folding walls between classrooms and replace damaged paneling
• Repair/replace deteriorated cabinets and sinks in selected classrooms
• Replace deteriorated floor tile in corridor at stage
• Renovate/refurbish student and faculty restrooms
• Replace deteriorated exhaust fans in student restrooms
• Repair/replace ventilation system heating boiler, pumps, piping and selected equipment
• Install emergency egress lighting
• Repair/replace deteriorated switchgear, motor controls and transformers
• Expand cafeteria and kitchen
• Add new PE teacher’s office, including restroom, shower and storage space
• Install playslab cover
• Install safety and security enhancements
• Replace electric drinking fountains
• Replace heating, cooling and ventilation system equipment at 300-classroom wing
• Install locking system for doors to classroom areas

2008 Bond Program Scope of Work

• Technology upgrades
• Replace electric drinking fountains
• Replace heating, ventilation and air conditioning system equipment in 300-classroom wing
• Install locking system for doors to classroom areas

Phases

Current Schedule Budget General Environmental
Install additional security lighting, construct drainage improvements, repair exterior doors, replace 35,000 square feet of built-up roofing, replace window wall; renovate restrooms, construct on-site parking and reseal existing parking lot, repave service drive, install playslab cover, replace folding wall between cafeteria and gym, construct permanent walls between classrooms, repair and replace cabinets and sinks in classrooms, replace floor tile, replace exhaust fans, repair heating and air conditioning system and make upgrades, install emergency egress lighting, replace electrical equipment, expand cafeteria and kitchen, add new PE teacher’s office, install safety and security enhancements. Complete. Within budget.* All designs will meet the Austin Energy standards.
Renovate/refurbish student and faculty restrooms; replace worn folding wall between cafeteria and gym; replace three heating, ventilation and air conditioning system air handling units and install new units to serve the library; repair/replace deteriorated switchgear, motor controls and transformers; expand cafeteria and kitchen. Complete. Within budget.* Free standing gym to be built instead of expanding the cafeteria and kitchen. All designs will meet the Austin Energy standards.
Construct drainage improvements around perimeter of building to divert storm water away from building; construct additional on-site parking and re-seal/re-stripe existing parking lot; re-pave service drive with concrete dumpster pad; install playslab cover; replace various heating, ventilation and air conditioning units; add new PE teacher’s office including restroom, shower and storage space; construct new PE building. Construction phase. Over budget.*
Safety and security: closed circuit TV. Complete. Within budget.* Grouped with three other schools.
Safety and security: card reader door access and door repair. Complete. Within budget.* Grouped with one other school.

*Budget for the 2004 and 2008 Bond Programs are reported as both individual project budgets and overall program budget. While specific projects may be over or under budget, the 2004 and 2008 Bond Programs remain well within the total program budget.

Photos

Click on photo for larger version.

There are no images for this project.
Find Out What's Happening at your School
Recent News
No news available.
SMTW TFS
1 2 3 4 5 6 7
8 9 10 11 12 13 14
15 16 17 18 19 20 21
22 23 24 25 26 27 28
29 30
Upcoming Events
There are no events scheduled. Other Events
  For Contractors