2004 Bond Program Scope of Work

• Repair/repave various sections of parking lots, and drives
• Install additional exterior security lighting
• Demolish incinerator stack and repair ventilation system cooling tower enclosure
• Construct canopy over library exit to playground
• Replace deteriorated exterior window wall systems at classrooms
• Construct permanent partitions between large classrooms in the 200-wing
• Replace ventilation system chiller
• Replace ventilation system cooling tower and selected equipment
• Replace selected sanitary sewer lines
• Replace deteriorated/non-functioning exhaust fans in restrooms
• Upgrade electrical feeders to support new ventilation equipment
• Install playslab cover
• Install safety and security enhancements
• Improve site drainage at front courtyard and on south side of school

2008 Bond Program Scope of Work

• Technology upgrades
• Improve site drainage at front courtyard and on south side of school
• Cafeteria and kitchen improvements

Phases

Current Schedule Budget General Environmental
Replace sanitary sewer lines. Complete. Under budget.*
Replace air conditioning cooling tower. Substantially complete. Over budget.* Replaced during Spring Break 2009.
Drainage, ventilation and accessibility improvements; regrade portions of site to improve drainage on west side of building near portables. Complete. Within budget of readjusted scope of work. Funded with 2002 bond funds.* Focus of work to eliminate water intrusion into crawlspaces, provide ventilation of crawlspaces. Erosion control measures.
Replace glass windows, install playslab cover, paving repairs, security and safety enhancements, replace heating, ventilation and air conditioning system; replace chiller and selected equipment; electrical upgrades. Complete. Under budget.* Glazing selection for reduced heat gain; commissioning for chiller to ensure energy efficiency.
Remove existing folding partition walls and construct new drywall partitions with outlets in eight classrooms. Complete. Under budget.*
Safety and security: closed circuit TV. Complete. Under budget.*
Safety and security: card reader door access and door repair. Complete. Under budget.*

*Budget for the 2004 and 2008 Bond Programs are reported as both individual project budgets and overall program budget. While specific projects may be over or under budget, the 2004 and 2008 Bond Programs remain well within the total program budget.

Photos

Click on photo for larger version.

There are no images for this project.
Find Out What's Happening at your School
Recent News
No news available.
SMTW TFS
1 2 3 4 5 6 7
8 9 10 11 12 13 14
15 16 17 18 19 20 21
22 23 24 25 26 27 28
29 30
Upcoming Events
There are no events scheduled. Other Events
  For Contractors