Projects for Boone

2004 Bond Program Scope of Work

• Install additional exterior security lighting
• Repair/replace deteriorated exterior metal doors, frames and hardware
• Replace folding wall between cafeteria and gym
• Replace ventilation system boilers, pumps and selected equipment
• Replace classroom ventilation heat pump units
• Install playslab cover
• Install safety and security enhancements
• Replace heating, cooling and ventilation system equipment at cafeteria, gymnasium, library and selected classrooms

2008 Bond Program Scope of Work

• Technology upgrades
• Replace heating, ventilation and air conditioning system equipment in cafeteria, gymnasium, library and selected classrooms

Phases

Current Schedule Budget General Environmental
Install additional exterior security lighting; repair/replace deteriorated exterior doors, frames and hardware; replace folding wall between cafeteria dining and gym; replace heating, ventilation and air conditioning systems boiler and pumps; replace classroom heating, ventilation and air conditioning heat pump units. Construction phase. Within budget.* Implementation will include energy efficient equipment and commissioning.
Install playslab cover. Complete. Over budget.* Grouped with four other schools.
Safety and security: card reader door access. Complete. Under budget.*
Safety and security: closed circuit TV. Complete. Within budget.*
Replace heating, ventilation and air conditioning system equipment at cafeteria, gymnasium and library. Design phase. Heating, ventilation and air conditioning equipment will be high efficiency and meet or exceed latest energy standards (ASHRAE 90.1, 2001).

*Budget for the 2004 and 2008 Bond Programs are reported as both individual project budgets and overall program budget. While specific projects may be over or under budget, the 2004 and 2008 Bond Programs remain well within the total program budget.

Photos

Click on photo for larger version.

There are no images for this project.
Find Out What's Happening at your School
Recent News
No news available.