Projects for Blanton

2004 Bond Program Scope of Work

• Install additional parking spaces at front loop drive
• Install canopy lighting and additional exterior security lighting
• Construct concrete pad for recycling container
• Repair/replace exterior doors, frames and hardware
• Repair/replace approximately 53,000 square feet of built-up roofing
• Replace window systems in 300/400-classroom wings
• Renovate existing special education Life Skills classroom
• Repair/replace damaged sink cabinets in selected classrooms
• Repair/replace damaged interior doors
• Renovate/refurbish student group restrooms
• Replace deteriorated exhaust fans in restrooms
• Replace selected ventilation system equipment
• Replace grease trap
• Replace domestic water lines in under-floor crawl space
• Replace sanitary sewer lines serving kitchen
• Install playslab cover
• Install safety and security enhancements

2008 Bond Program Scope of Work

• Technology upgrades

Phases

Current Schedule Budget General Environmental
New visitor parking, heating and air conditioning renovations, partial facility roof replacement, restrooms, life skill classroom renovations, window replacement, crawl space plumbing/piping replacement, new grease trap, interior and exterior door replacement/repair, closed circuit TV and card reader door access installations. Complete. Under budget.* Heating and air conditioning improvements; reflective roof coatings required for roof replacement work. Austin Energy has been notified of intent to apply for energy rebates. Roofing insulation and ventilation upgrades.
Provide additional electrical power for computer network upgrades. Complete. Over budget.*
Heating and air conditioning improvements. Complete. Within budget.* All new mechanical systems will meet and exceed the latest energy standards. After the project complete ion, the project will be commissioned to ensure that all newly installed mechanical systems operate at their peak efficiency.

*Budget for the 2004 and 2008 Bond Programs are reported as both individual project budgets and overall program budget. While specific projects may be over or under budget, the 2004 and 2008 Bond Programs remain well within the total program budget.

Photos

Click on photo for larger version.

There are no images for this project.
Find Out What's Happening at your School
Recent News
No news available.
SMTW TFS
1 2 3 4 5 6 7
8 9 10 11 12 13 14
15 16 17 18 19 20 21
22 23 24 25 26 27 28
29 30
Upcoming Events
There are no events scheduled. Other Events
  For Contractors