Projects for Barrington

Click here for Bond Program Survey feedback for Barrington

2004 Bond Program Scope of Work

• Install additional exterior security lighting
• Improve storm/site drainage at building perimeter
• Construct concrete dumpster pads
• Construct cover over ramp and sidewalk between main building and library
• Repair/replace approximately 58,000 square feet of built-up roofing
• Repair/replace deteriorated window wall system at courtyard
• Replace folding partitions between classrooms
• Renovate selected administration areas to improve visibility of main entrance and corridor
• Repair/replace cabinets and casework in selected classrooms
• Replace floor coverings in library, music room, administration area and gym
• Renovate/refurbish student group and faculty restrooms
• Replace deteriorated ventilation system controls and equipment
• Replace deteriorated exhaust fans
• Replace ventilation system boiler and selected equipment
• Install additional electrical outlets in administration area
• Expand kitchen serving line
• Install playslab cover
• Install safety and security enhancements

2008 Bond Program Scope of Work

• Technology upgrades
• Construct eight-classroom addition
• Cafeteria and kitchen improvements
• Replace dishwasher

Phases

Current Schedule Budget General Environmental
Install playslab cover. Complete. Under budget.* Grouped with five other schools.
Safety and security: closed circuit TV. Complete. Under budget.* Grouped with three other schools.
Safety and security: card reader door access and door repair. Complete. Within budget.* Grouped with one other school.
Replace 58,000 square feet of built-up roofing. Complete. Within budget.* New replacement will provide increased thermal efficiency and solar reflectivity.
Install security lighting, construct draining improvements, repair exterior doors, replace window wall, renovate restrooms, construct additional on site parking, repave service drive with concrete, install playslab cover, replace folding wall between cafeteria and gym, construct permanent walls between classrooms, repair and improve heating and air conditioning units, install emergency egress lighting, repair electrical equipment, expand cafeteria and kitchen, add new PE teacher office. Complete. Over budget.* Final project close out documents being prepared. Green building principles employed.
Construct eight-classroom addition; construct cafeteria/kitchen improvements; replace dishwasher. Design phase. New construction will meet Austin Energy Green Building two-star rating.

*Budget for the 2004 and 2008 Bond Programs are reported as both individual project budgets and overall program budget. While specific projects may be over or under budget, the 2004 and 2008 Bond Programs remain well within the total program budget.

Photos

Click on photo for larger version.

There are no images for this project.
Find Out What's Happening at your School
Recent News
No news available.
SMTW TFS
1 2 3 4 5 6 7
8 9 10 11 12 13 14
15 16 17 18 19 20 21
22 23 24 25 26 27 28
29 30
Upcoming Events
There are no events scheduled. Other Events
  For Contractors