2004 Bond Program Scope of Work
Construct additional parking spaces in selected areas
Repair service drive and reseal all asphalt paving
Resurface tennis courts
Construct sidewalks along west side of buildings
Repair/replace deteriorated exterior doors, frames and hardware
Apply slip-resistant surface treatment at covered walkway
Repair/replace brick masonry in various locations and add masonry control joints
Repair/replace approximately 15,000 square feet of built-up roofing and repair sections of metal roofing
Renovate/refurbish student and faculty restrooms
Create restroom and shower for PE teachers from existing space
Install lockable cabinets in tech ed lab
Replace clock system
Replace worn floor covering in selected areas
Repair/refurbish student lockers
Replace deteriorated ventilation system controls and equipment
Replace ventilation system chiller
Replace exhaust fans in student and faculty restrooms and in girls and boys PE dressing areas
Repair/replace/modify selected ventilation system equipment
Replace electrical switchgear, motor control center, panel boards and deteriorated wiring
Enlarge health services and create faculty center and workroom from existing space
Renovate theater arts classroom
Install safety and security enhancements
2008 Bond Program Scope of Work
Technology upgrades
Replace dishwasher
Phases
| Current |
Schedule |
Budget |
General |
Environmental |
| Repair/replace approximately 15,000 square feet of built-up roofing and repair sections of metal roofing. |
Complete. |
Within budget.* |
Coordinated with ventilation project and cabling concerns on the roof. By spreading out the work, more contactors will bid lower prices. |
New replacement of roof system will provide increased thermal efficiency and solar reflectivity includes replacing standing seam metal roofing at gym. |
| Drainage, ventilation and accessibility improvements. |
Complete. |
Within budget.* |
After field investigations, it was determined that proper drainage improvements should offset any ventilation requirements to control moisture in crawlspaces. Grouped with two other schools. |
Environmental considerations are limited to on-site drainage projects. Care will be taken to avoid excess soil erosion during construction. |
| Safety and security: card reader door access and door repair. |
Construction phase. |
Within budget.* |
Board award October 2008. Grouped with four other schools. |
|
| Additional parking, reseal asphalt paving, resurface tennis courts, construct sidewalks, replace and repair doors and frames, repair and replace brick masonry, student and faculty restrooms, replace worn floor coverings, repair student lockers, replace ventilation system, upgrade electrical system, enlarge health services, faculty center and workroom, renovate theater arts, and closed circuit TV. |
Substantially complete. |
Over budget.* |
Final adjustments to heating, ventilation and air conditioning system and controls underway. |
All designs will meet Austin Energys two-star Green Building rating. |
| Insert supplemental outside air system. |
Complete. |
Within budget. Funded with 2002 bond funds.* |
|
The new mechanical system exceeds latest energy standards (ASHRAE 90.1, 2001). |
|
*Budget for the 2004 and 2008 Bond Programs are reported as both individual project budgets and overall
program budget. While specific projects may be over or under budget, the 2004 and 2008 Bond Programs remain well
within the total program budget.
Photos
Click on photo for larger version.
| There are no images for this project. |
|
|