Projects for Dobie

2004 Bond Program Scope of Work

• Reseal and restripe parking lot and drives
• Install additional exterior security lighting
• Construct concrete service drive and dumpster pad
• Repair/replace deteriorated exterior doors, frames, and hardware
• Repair/replace approximately 68,000 square feet of built-up roofing
• Install display cabinets for art classrooms
• Replace clock system
• Renovate/refurbish student and faculty restrooms
• Repair/replace/modify selected ventilation system equipment
• Replace deteriorated ventilation system controls and equipment
• Replace electrical switchgear and motor control center
• Construct addition to girls’ and boys’ athletic dressing/locker areas
• Construct four-classroom addition for art rooms, graphics lab, and computer rooms
• Install safety and security enhancements
• Replace heating, cooling and ventilation system equipment at band hall and orchestra room
• Replace bleachers

2008 Bond Program Scope of Work

• Technology upgrades
• Replace heating, ventilation and air conditioning system equipment in band hall and orchestra room
• Replace bleachers
• Replace dishwasher

Phases

Current Schedule Budget General Environmental
Resealing and restriping the parking lot and drive, resurfacing the service drive and adding an accessibility compliant sidewalk. Complete. Within budget.*
Kitchen hood fire suppression replacement. Complete. Under budget.*
Construct art rooms, graphics lab, computer rooms, expansion to PE area for weight room, renovate girls and boys locker areas, teacher offices, restrooms, and showers, PE equipment storage, install supplemental conditioned fresh air system for classrooms, install security lighting, repair and replace roofing, repair/replace deteriorated exterior doors, frames and hardware, renovate and refurbish student and faculty restrooms, convert ventilation controls, replace electrical switchgear and motor control center, install display cabinets for art classrooms, replace clock system, replace ventilation air handling units, safety enhancements and security card reader door access. Complete. Over budget.* Energy, water and sustainability consultant will be involved in design review and system acceptance for the ventilation equipment.
Repair/replace heating, ventilation and air conditioning equipment in band and orchestra rooms. Design phase. Grouped with project at Burnet Middle School and Andrews Elementary School. Heating, ventilation and air conditioning equipment will be high efficiency and meet or exceed latest energy standards (ASHRAE 90.1, 2001).

*Budget for the 2004 and 2008 Bond Programs are reported as both individual project budgets and overall program budget. While specific projects may be over or under budget, the 2004 and 2008 Bond Programs remain well within the total program budget.

Photos

Click on photo for larger version.

There are no images for this project.
Find Out What's Happening at your School
Recent News
No news available.
SMTW TFS
1 2 3 4 5 6 7
8 9 10 11 12 13 14
15 16 17 18 19 20 21
22 23 24 25 26 27 28
29 30
Upcoming Events
There are no events scheduled. Other Events
  For Contractors