2004 Bond Program Scope of Work
• Improve storm/site drainage in selected areas
• Excavate and re-establish storm water detention/filtration pond
• Replace deteriorated exterior doors, frames and hardware
• Reseal masonry control/expansion joints
• Repair/replace approximately 70,000 square feet of roofing
• Enlarge and renovate selected science classrooms
• Replace selected library casework/cabinetry/furnishings
• Replace clock system
• Renovate selected student and public restrooms
• Replace deteriorated ventilation system controls and equipment
• Refurbish/replace ventilation system cooling tower, four chillers, boilers, pumps and selected equipment
• Replace deteriorated exhaust fans
• Install emergency egress and exit lights
• Install additional lighting in hallways of 170- and 270-classroom wings and open courtyards
• Install eyewash sinks in science labs
• Add elevator at west courtyard
• Renovate boys’ athletic locker room
• Install safety and security enhancements
• Purchase automotive/collision equipment for Automotive Career Center
2008 Bond Program Scope of Work
• Technology upgrades
• Purchase automotive/collision equipment for Automotive Career Center
• Construct two-science classroom addition
• Install science safety equipment
• Cafeteria and kitchen improvements
• Replace dishwasher
Phases
| Current |
Schedule |
Budget |
General |
Environmental |
| Removal of existing drywall partition and installation of additional electronic components in the main distribution frame technology control room. |
Complete. |
Under budget.* |
Modification will expand Greater Austin Area Telecommunications Network (GAATN) system to accommodate new schools. |
Asbestos abatement was performed on a drywall partition and limited amount of floor tile. The work has been completed. |
| Install traffic gates. |
Complete. |
Within budget.* |
|
|
| Repair/replace approximately 70,000 square feet of roofing. Includes roof replacement and metal deck remediation work above performing arts center, band hall, weight room and gymnastics room. |
Complete. |
Under budget.* |
|
Replacement roof system will have increased thermal efficiency and solar reflectivity. |
| Safety and security: card reader door access. |
Complete. |
Within budget.* |
|
|
| Site drainage improvements, science classrooms renovations, plumbing upgrades, heating, ventilation and air conditioning system modifications, elevator installation, door hardware modifications, re-seal exterior masonry, and safety and security enhancements. |
Substantially complete. |
Over budget.* |
Delay due to asbestos on plumbing. Some door hardware changes are underway and heating, ventilation and air conditioning systemsystem adjustments are ongoing. |
An energy consultant was retained for this work. Implementation included high efficiency ventilation, water quality and water savings measures. |
| Replace 42,000 square feet of built-up roofing and insulation. |
Complete. |
Under budget.* |
|
New roof will provide increased thermal efficiency and solar reflectivity. |
| Construct two-science classroom addition and acquire science safety equipment; construct kitchen improvements; replace dishwasher. |
Design phase. |
|
|
New construction will meet Austin Energy Green Building two-star rating. |
|
*Budget for the 2004 and 2008 Bond Programs are reported as both individual project budgets and overall
program budget. While specific projects may be over or under budget, the 2004 and 2008 Bond Programs remain well
within the total program budget.
Photos
Click on photo for larger version.
| There are no images for this project. |
|
|
Find Out What's Happening at your School
Recent News
No news available.
Upcoming Events
There are no events scheduled.
Other Events
|