2004 Bond Program Scope of Work
Repair, reseal and restripe parking lot
Reactivate/replace storm drainage lines in various locations
Replace worn exterior door hardware
Repair/replace approximately 98,000 square feet of built-up roofing
Replace drinking fountains in 100- and 200-wings
Replace ventilation system cooling tower
Replace deteriorated exhaust fans in various locations
Repair/replace/modify selected ventilation system equipment
Replace grease trap sanitary sewer lines serving kitchen
Replace selected library casework/cabinetry/furnishings
Renovate existing AV storage into library reading room
Install elevator for 200/300-classroom wings
Install additional electrical outlets in teachers workroom and administrative offices
Install playslab cover
Install safety and security enhancements
Replace sanitary sewer line at Annex
Replace tile flooring at entry
2008 Bond Program Scope of Work
Technology upgrades
Cafeteria and kitchen improvements
Replace dishwasher
Replace sanitary sewer line at annex
Replace tile flooring at entry
Phases
| Current |
Schedule |
Budget |
General |
Environmental |
| Reactivate/replace underground storm drainage lines at west side of gym, at annex and at 200/300 classroom wing; replace worn exterior door hardware; replace deteriorated heating, ventilation and air conditioning system cooling tower; replace heating, ventilation and air conditioning duct work located in below floor crawl space serving music room; repair, reseal and re-stripe parking lot; replace porcelain drinking fountains with electric water coolers in 100 and 200 wings; replace deteriorated/non-functioning exhaust fans and install new fans in various locations; replace grease trap; replace sanitary sewer lines under kitchen; renovate existing audio visual storage into library reading room; replace/refurbish deteriorated furniture, fixtures and equipment including circulation desk; install elevator for 200/300 classroom wings. |
Complete. |
Over budget.* |
Project delayed due to addition to original scope of work to include an installation of an elevator. Grouped with work at Zavala Elementary School. |
New heating, ventilation and air conditioning equipment will be energy efficient. |
| Install playslab cover. |
Complete. |
Over budget.* |
Grouped with four other schools. |
|
| Repair/replace approximately 98,000 square feet of built-up roofing. |
Complete. |
Under budget.* |
|
New replacement roof system will provide increased thermal efficiency and solar reflectivity. |
| Safety and security enhancements: card reader access. |
Complete. |
Within budget.* |
|
|
| Replace fire alarm system. |
Complete. |
Under budget.* |
|
|
| Safety and security: closed circuit TV. |
Complete. |
Under budget.* |
|
|
| Relocate professional library. |
Complete. |
Within budget.* |
|
|
| Renovation of two locker rooms. |
Complete. |
Within budget.* |
|
|
|
*Budget for the 2004 and 2008 Bond Programs are reported as both individual project budgets and overall
program budget. While specific projects may be over or under budget, the 2004 and 2008 Bond Programs remain well
within the total program budget.
Photos
Click on photo for larger version.
| There are no images for this project. |
|
|